$15,000 Bathroom Renovation Adelaide
$15,000 gets you into partial-renovation territory. You can strip the wet zones, re-waterproof, re-tile, and fully refit with stock fixtures. Still tight, but the result is not a makeover anymore.
Budget
$15k
Duration
3-4 weeks
Room Fit
Best for small to medium bathrooms (4-6sqm) needing a full refresh.
What is included at this budget
- Full tile removal in wet zones
- New waterproofing to AS 3740, licensed
- New tile (standard ceramic, 300x600 or 600x600)
- Vanity + basin (stock, 750-900mm)
- Shower base or walk-in with frameless panel
- Complete tapware set (basin, bath, shower, toilet)
- New toilet, heated towel rail, shaving cabinet
- Paint + all silicone + finishing
What is not included
- Layout changes (soil stack relocation)
- Stone benchtops or imported tile
- Underfloor heating
- Designer tapware
Where every dollar goes.
Pulled from active Adelaide renovator quotes in the $15k band. Ranges reflect realistic supplier and labour variations.
| Line Item | Cost Range |
|---|---|
| Demolition + rubbish removal | $700 - $1,100 |
| Waterproofing (licensed to AS 3740) | $1,700 - $2,200 |
| Tile supply (ceramic, 300x600) | $1,400 - $2,000 |
| Tile labour | $2,200 - $2,800 |
| Vanity, basin, mixer | $1,800 - $2,300 |
| Shower (base + screen + rail) | $2,000 - $2,600 |
| Toilet + shaving cabinet + rail | $900 - $1,300 |
| Plumbing + electrical | $2,200 - $2,800 |
| Total band | Approx $15k |
Get three quotes at this budget.
Tell us about your project. We match you with three Adelaide renovators who regularly quote $15k projects.
15k budget FAQ.
Is $15,000 enough for a full bathroom renovation in Adelaide?
+
$15,000 gets you into partial-renovation territory. You can strip the wet zones, re-waterproof, re-tile, and fully refit with stock fixtures. Still tight, but the result is not a makeover anymore.
What is included in a $15,000 bathroom renovation?
+
Full tile removal in wet zones, New waterproofing to AS 3740, licensed, New tile (standard ceramic, 300x600 or 600x600), Vanity + basin (stock, 750-900mm), Shower base or walk-in with frameless panel, Complete tapware set (basin, bath, shower, toilet), New toilet, heated towel rail, shaving cabinet, Paint + all silicone + finishing
What is not included at this budget?
+
Layout changes (soil stack relocation), Stone benchtops or imported tile, Underfloor heating, Designer tapware
How long does a $15,000 bathroom renovation take in Adelaide?
+
3 to 4 weeks from demolition to final hand-off. Your matched renovator provides a fixed schedule in the quote.
Ready to quote a $15k Adelaide bathroom?
Three matched Adelaide renovators, fixed-price quotes, within 24 hours.