$20,000 Bathroom Renovation Adelaide

$20,000 is the most common bathroom renovation budget in Adelaide. Full strip-out, new waterproofing, new tile, and a quality-fitted result without premium material costs. For most average-sized Adelaide bathrooms, this budget tier delivers a confident, complete finish.

Budget

$20k

Duration

4-6 weeks

Room Fit

Best for standard main bathrooms (6-8sqm) with no major layout changes.

What is included at this budget

  • Full demolition to studs and slab
  • New waterproofing to AS 3740, certified
  • Mid-range tiles (porcelain, 600x600 or 600x1200)
  • Mid-tier vanity with stone top (Caesarstone)
  • Frameless shower screen
  • Quality tapware (Phoenix, Meir, Sussex)
  • New toilet, towel rail, lighting upgrade
  • Partial layout flex (move vanity, change shower direction)

What is not included

  • Wall repositioning or soil stack moves
  • Stone slab walls
  • Imported European tapware
  • Underfloor heating
Line-Item Breakdown

Where every dollar goes.

Pulled from active Adelaide renovator quotes in the $20k band. Ranges reflect realistic supplier and labour variations.

Line ItemCost Range
Demolition + rubbish$1,000 - $1,500
Waterproofing (AS 3740)$2,000 - $2,600
Tile supply (porcelain)$2,400 - $3,500
Tile labour (levelling system)$2,800 - $3,600
Vanity + stone top$2,400 - $3,200
Shower + frameless screen$2,600 - $3,400
Tapware set (mid-tier)$1,400 - $2,000
Plumbing + electrical$2,800 - $3,800
Finishing + silicone + paint$800 - $1,200
Total bandApprox $20k
Next Step

Get three quotes at this budget.

Tell us about your project. We match you with three Adelaide renovators who regularly quote $20k projects.

By submitting, you agree to be contacted by up to three pre-vetted Adelaide renovators. We never share your details beyond that. No spam, ever.

20k budget FAQ.

Is $20,000 enough for a full bathroom renovation in Adelaide?

+

$20,000 is the most common bathroom renovation budget in Adelaide. Full strip-out, new waterproofing, new tile, and a quality-fitted result without premium material costs. For most average-sized Adelaide bathrooms, this budget tier delivers a confident, complete finish.

What is included in a $20,000 bathroom renovation?

+

Full demolition to studs and slab, New waterproofing to AS 3740, certified, Mid-range tiles (porcelain, 600x600 or 600x1200), Mid-tier vanity with stone top (Caesarstone), Frameless shower screen, Quality tapware (Phoenix, Meir, Sussex), New toilet, towel rail, lighting upgrade, Partial layout flex (move vanity, change shower direction)

What is not included at this budget?

+

Wall repositioning or soil stack moves, Stone slab walls, Imported European tapware, Underfloor heating

How long does a $20,000 bathroom renovation take in Adelaide?

+

4 to 6 weeks from demolition to final hand-off. Your matched renovator provides a fixed schedule in the quote.