$20,000 Bathroom Renovation Adelaide
$20,000 is the most common bathroom renovation budget in Adelaide. Full strip-out, new waterproofing, new tile, and a quality-fitted result without premium material costs. For most average-sized Adelaide bathrooms, this budget tier delivers a confident, complete finish.
Budget
$20k
Duration
4-6 weeks
Room Fit
Best for standard main bathrooms (6-8sqm) with no major layout changes.
What is included at this budget
- Full demolition to studs and slab
- New waterproofing to AS 3740, certified
- Mid-range tiles (porcelain, 600x600 or 600x1200)
- Mid-tier vanity with stone top (Caesarstone)
- Frameless shower screen
- Quality tapware (Phoenix, Meir, Sussex)
- New toilet, towel rail, lighting upgrade
- Partial layout flex (move vanity, change shower direction)
What is not included
- Wall repositioning or soil stack moves
- Stone slab walls
- Imported European tapware
- Underfloor heating
Where every dollar goes.
Pulled from active Adelaide renovator quotes in the $20k band. Ranges reflect realistic supplier and labour variations.
| Line Item | Cost Range |
|---|---|
| Demolition + rubbish | $1,000 - $1,500 |
| Waterproofing (AS 3740) | $2,000 - $2,600 |
| Tile supply (porcelain) | $2,400 - $3,500 |
| Tile labour (levelling system) | $2,800 - $3,600 |
| Vanity + stone top | $2,400 - $3,200 |
| Shower + frameless screen | $2,600 - $3,400 |
| Tapware set (mid-tier) | $1,400 - $2,000 |
| Plumbing + electrical | $2,800 - $3,800 |
| Finishing + silicone + paint | $800 - $1,200 |
| Total band | Approx $20k |
Get three quotes at this budget.
Tell us about your project. We match you with three Adelaide renovators who regularly quote $20k projects.
20k budget FAQ.
Is $20,000 enough for a full bathroom renovation in Adelaide?
+
$20,000 is the most common bathroom renovation budget in Adelaide. Full strip-out, new waterproofing, new tile, and a quality-fitted result without premium material costs. For most average-sized Adelaide bathrooms, this budget tier delivers a confident, complete finish.
What is included in a $20,000 bathroom renovation?
+
Full demolition to studs and slab, New waterproofing to AS 3740, certified, Mid-range tiles (porcelain, 600x600 or 600x1200), Mid-tier vanity with stone top (Caesarstone), Frameless shower screen, Quality tapware (Phoenix, Meir, Sussex), New toilet, towel rail, lighting upgrade, Partial layout flex (move vanity, change shower direction)
What is not included at this budget?
+
Wall repositioning or soil stack moves, Stone slab walls, Imported European tapware, Underfloor heating
How long does a $20,000 bathroom renovation take in Adelaide?
+
4 to 6 weeks from demolition to final hand-off. Your matched renovator provides a fixed schedule in the quote.